| Riser Installation | |
|
|
| HAFAR DAYA KONSTRUKSI | |
| Risers and spools are installed using the stalk-on method. This involves lifting the riser and tie-in to the spool at platform deck level. Alternatively tie-in to the pipeline can be performed at seabed. | |
| OTHERS EPC : | |